Skip Navigation to main content U.S. Department of Energy U.S. Department of Energy Energy Efficiency and Renewable Energy
Bringing you a prosperous future where energy is clean, abundant, reliable, and affordable EERE Home
Wind & Hydropower Technologies Program
About the ProgramProgram AreasInformation ResourcesFinancial OpportunitiesTechnologiesDeploymentHome
Wind-Diesel Workshop

 

EERE Information Center


Wind-Diesel Workshop

Introduction to Wind/Diesel Systems
Workshop Agenda
Project Field Trips
Presentations and Posters
Registration
Sponsorship and Exhibits
Hotel and Travel
Contact


Wind-Diesel Project Field Trips

Saturday and Sunday, April 26-27, 2008

A great opportunity to visit commercial wind-diesel projects in rural Alaska. Participants choosing to take part in the field trips will fly to two remote communities, Kasigluk, with a stopover in Bethel, and Kotzebue, to tour the wind-diesel plants and talk with local operators and village leaders on the operations and value of retrofitting diesel mini-grids with wind turbines and associated controls.

Kasigluk Itinerary

Saturday, April 26, 2008

The group will fly via Alaska Airlines from Anchorage to Bethel, departing Anchorage at 12:20 p.m. and arriving in Bethel at 1:37 p.m. We will then transfer to a charter flight for the 15-minute trip to Kasigluk with a sack lunch provided along the way. After the tour of the power system and community, we will return to Bethel and fly back to Anchorage on the 8:49 p.m. Alaska Airlines flight, arriving in Anchorage at 9:57 p.m. This portion of the trip is likely to cost approximately $450.00.

We have booked a block of rooms at the Coast International Inn which has a shuttle from the airport at a discounted rate of $69/night. You are welcome to stay at another hotel, but due to the late arrival and early departure, someplace close to the airport would be recommended. Depending on our arrival, we will probably drop by one of the local eating establishments for a light, informal meal or eat in Bethel depending on our timing.

Kotzebue Itinerary

Sunday, April 27, 2008

We will catch the early 6:00 a.m. Alaska Airline flight to Kotzebue, arriving at about 7:45 a.m. and visit the Kotzebue wind farm and diesel plant. After lunch, we will return to Anchorage on the 2:47 p.m. Alaska Airline flight, getting back into Anchorage at 4:17 p.m., allowing people to catch Sunday night flights out of Alaska if required. This day trip will cost approximately $350.00

Hotel and Travel Information

Each person will be responsible for booking their own hotel accommodations and commercial airline flight. The charter flights between Bethel and Kasigluk will be organized by the Alaska Energy Authority.

Booking codes for the Coast International Inn hotel is 1521 or they can be contacted directly, reference the "Wind Diesel Group/Conference/Workshop" to get the discount. Alaska Airlines has also provided a discount code (ECCMB0229) for travel to Bethel and Kotzebue which will provide a 10% group reduction in posted fairs. Alaska Airlines flights can be booked directly with Alaska Airlines or through your local travel agent.

Saturday, April 26th

Flight 43 from Anchorage (ANC) to Bethel (BET) — 12:20 p.m. Departure

Flight 46 from Bethel (BET) to Anchorage (ANC) — 8:49 p.m. Departure

Sunday, April 27th

Flight 151 from Anchorage (ANC) to Kotzebue (OTZ) — 6:00 a.m. Departure

Flight 152 from Kotzebue (OTZ) to Anchorage (ANC) — 2:47 p.m. Departure

Kotzebue Wind/Diesel System

A photo of four wind turbines. A photo one wind turbine.

Kotzebue Electric Association (KEA) is a non-profit cooperative, which owns and operates an 11.2-MW capacity diesel electrical utility to provide power for Kotzebue, Alaska. Kotzebue is a community of about 3,100 people and is the service hub for all villages in this northwest region of Alaska.

The KEA wind power project consists of 17 wind turbines installed at a single site totaling 1.04 MW of rated capacity. Fifteen of the turbines are Entegrity EW15's models (some dating back to the old Atlantic Orient Company days) of Boulder, Colorado and Charlottetown PEI, Canada. Three of the turbines have been operating since July 1997. The Entegrity EW15's is a three-bladed, downwind turbine with at 15-meter rotor diameter.

The sixteenth turbine, a North Wind 100, is manufactured by Distributed Energy Systems (Northern Power Systems) of Barre, Vermont. It was installed in April 2002. The NW 100 is a three-bladed, upwind turbine with a direct-drive generator designed for cold climate conditions, remote villages, and distributed generation.

The last turbine is a remanufactured Vestas V15 65kW turbine was installed at the site. This three bladed turbine is a classic upwind, fixed pitch induction turbine and has been operating for several years.

Lastly, in 2007 KEA installed a complete new SCADA system to assist in the monitoring and control of all of the wind and diesel turbines. KEA is also in the initial phases of working on a project to install a small battery storage system to allow for the expanded use of wind energy.

Kasigluk Wind/Diesel System

A photo of the Kasigluk community with two wind turbines.

Kasigluk is a small community in south western Alaska along the Johnson River, about 15 minutes flight time from the regional hub of Bethel. Kasigluk is made up of two separate small villages, Akiuk and Akula, whose combined population of 600 receive their power from a wind-diesel power system operated and owned by the Alaska Village Electric Cooperative (AVEC). The power system incorporates a modern, module diesel plant and three North Wind 100 wind turbines manufactured by Distributed Energy Systems (Northern Power Systems) of Barre, Vermont. The system was installed in July of 2006 and has been operating since that time. With an average electrical load of around 250 kW the turbines have the ability to provide most of the community's electrical energy needs, although the power system is not configured to operate with all of the diesels turned off. This wind-diesel system also supplies power to nearby Nunapitchuk and Old Kasigluk. This system is estimated to displace 52,000 gallons of diesel fuel per year.

 

 

Printable Version

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


Skip footer navigation to end of page.