|
May 6, 2003
We Energies
Public Service Building - Auditorium
The following documents are available as Adobe Acrobat PDFs. Download Acrobat Reader.
Event flier (PDF 684 KB)
List of attendees (PDF 282 KB)
Meeting Agenda
- Welcome and Opening Remarks
Phyllis Dube, We Energies Venu Gupta, City of Milwaukee
- DE: The National Perspective
Anne-Marie Borbely-Bartis, Battelle at the U.S. Department of Energy (PDF 219 KB)
- Fuel Cells: Installation and Operation
Anne-Marie Borbely-Bartis, Battelle at the U.S. Department of Energy (PDF 249 KB)
- Microturbines: Installation and Operation
Jim Watts, Ingersoll-Rand Inc. (PDF 4.8 MB)
- Photovoltaic Systems: Installation and Operation
Andrew Bangert, H&H Electric (PDF 392 KB)
- Statewide Perspective: DE and DG Interconnection
Larry Krom, Focus on Energy (PDF 1.4 MB)
- Local Perspective: We Energies' Role in DE and DG Interconnection
Dave Schigoda, We Energies (PDF 604 KB)
- Structured Discussion and Q&A
Anne-Marie Borbely-Bartis, facilitator
- Tour of Lake Tower Microturbine/CHP Installation
City of Milwaukee/We Energies
|